Assigning Project Roles and Using Tags

An overview of the standard roles (PM, BA, DEV, AI Engineer, SALE) and how to use tags to classify the nature of work in a project.

Administrator · 02/05/2026 · 305 views

1. Why assign roles?

A project usually involves people with very different skills. Standardized roles help you:

  • Assign work correctly (give a design task to a DEV, not a BA).
  • Run reports by role (e.g., total AI Engineer hours this month).
  • Standardize references across projects.

2. Five standard roles

Role Primary responsibility
PM Project manager — owns overall schedule, budget, and quality.
BA Business analyst — discovery, requirements documentation (FSD, User Guide).
DEV Software developer — coding, bug fixes, system integration.
AI Engineer Builds AI solutions — RAG, OCR, chatbots, STT/TTS.
SALE Sales / customer success — bridges the deal as it moves into delivery.

3. Project tagging system

Tags help filter and group projects by nature:

  • Dev, Fix Bugs, Design — Engineering work types.
  • Planning, Review, Final — Review phases.
  • PoC (Proof of Concept) — Experimental projects, not production.
  • Marketing, Inventory, Common, Present, BA — Other categories.

4. Practical conventions

  • A project should have at least one PM before moving to "In Progress".
  • The PoC tag really matters — it cleanly separates experiments from production work in revenue reports.
  • Avoid tags that mean the same thing (e.g., "Bug" and "Fix Bugs") — keep one canonical tag set system-wide.

5. Tips on tagging effectively

Each project should carry 2–4 tags:

  • 1 tag for nature of work (Dev, Marketing, BA…).
  • 1 tag for phase (Planning, Final…) where applicable.
  • 1 special tag like PoC if relevant.

Too many tags dilute the signal.